[8]Pengxing Yi*, Min Huang, Lijun Guo and Tielin Shi. A Retailer Oriented Closed-loop Supply Chain Network Design for End of Life Construction Machinery Remanufacturing. Journal of Cleaner Production, 2016, 137: 1393-1405, corresponding author.
Release time:2022-11-21
Hits:
- Pre One:[9]Kang Zhang, Pengxing Yi*, Xuming Zhang, Yahui Li, and Bing Hui. A new method to evaluate the surface defects with the EMAT. Sensors, 2015, 15 (7): 17420-32, corresponding author.
- Next One:[7]Penxing Yi*, Min Huang, Lijun Guo and Tielin Shi. Dual Reverse Channel Decision in Retailer Oriented Closed-loop Supply Chain for Construction Machinery Remanufacturing. Journal of Cleaner Production, 2016, 016, 124: 191-203, corresponding author.