论文类型:期刊论文
第一作者:Jinwen Wang
通讯作者:Jinwen Wang
发表刊物:Energy Conversion and Management
收录刊物:EI、SCI
所属单位:Huazhong University of Science and Technology
学科门类:工学
一级学科:水利工程
文献类型:J
卷号:50
页面范围:1085–1094
发表时间:2009-01-10
摘要:The Fujian hydropower system (FHS) is one of the provincial hydropower systems with the most complicated hydraulic topology in China. This paper describes an optimization program that is required by Fujian Electric Power Company Ltd. (FEPCL) to aid the shift engineers in making decisions with the shortterm hydropower scheduling such that the generation benefit can be maximal. The problem involves 27 reservoirs and is formulated as a nonlinear and discrete programming. It is a very challenging task to solve such a large-scale problem. In this paper, the Lagrangian multipliers are introduced to