·Paper Publications
- [1] LIU ZHEN YUAN,王承涛.许明阳.基于数据增强和字词融合特征的实体槽位识别.[J].华中科技大学学报(自然科学版),2022,(11):101-106
- [2] Zhengming Hua,Lijing Yang,Liu Yang.Zhenyuan Liu.Improved genetic algorithm based on time windows decomposition for solving resource-constrained project scheduling problem.Automation in Construction,2022,104503
- [3] Yuan Tian,Tifan Xiong,Yi Mei,Li Wan.Zhenyuan Liu.Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches.Computers & Industrial Engineering,2022,107897
- [4] Zhengming Hua,Liu Yang,Raoyi Deng.Zhenyuan Liu.Search Space Decomposition for Resource-Constrained Project Scheduling.[J].Automation in Construction,2022,104040
- [5] 许明阳,王承涛.刘振元.基于多任务学习的 IT 运维服务需求语义解析.计算机集成制造系统,2022,(https://kns.cnki.net/kcms/detail/ 11.5946.tp.20220):
- [6] LIU ZHEN YUAN,袁慧涛.多技能资源时间窗约束下可中断项目调度的分支定界算法.[J].系统工程理论与实践,2019,(1):183-199
- [7] Zhenyuan Liu,Zhenyuan Liu , Jiongbing Lu, Zaisheng Liu, Guangrui Liao, Hao Howard Zhang, Junwu Dong.Patient Scheduling in Hemodialysis Service.Journal of Combinatorial Optimization,2018,
- [8] Zhenyuan Liu,Zhenyuan Liu , Zaisheng Liu, Zhipeng Zhu, Yindong Shen, Junwu Dong.Simulated Annealing for a Multi-Level Nurse Rostering Problem in Hemodialysis Service.Applied Soft Computing,2018,148-160
- [9] Zhenyuan Liu,Zhenyuan Liu , Yakun Zhang, Minghui Yu, Xiaolu Zhou.Heuristic algorithm for ready-mixed concrete plant scheduling with multiple mixers.Automation in Construction,2017,1-13
- [10] Zhenyuan Liu,Zhenyuan Liu , Liu Yang, Raoyi Deng, Jing Tian.An effective approach with feasible space decomposition to solve resource-constrained project scheduling problems.Automation in Construction,2017,1-9